Na-yong BOT water supply System, Guizhou
Client: Na-yong county government Construction period: 2004-2005
The BOT project consists of a 6.5 MGD water treatment plant, a main piping system for water distribution serving a population of more than 50,000, and a 10 mile water transmission pipe from the reservoir to the plant. The project was commissioned in November, 2005, but it was later sold back by the county government due to a water resource issue defined as the government¨s duty by the contract.   More´[First Two HTI's BOT Water Treatment Plants Now in Operation]
Source: http://www.sasac.gov.cn/zyqy/gcjz/200511210168.htm
|
|