Zhan-yi BOT WWTP,Yunnan
Yi-liang BOT WWTP,Yunnan
Ning-hua BOT WWTP,Fujian
Xi-tang BOT WWTP,Zhejiang
Yin-chuan first WWTP, Ningxia
Xiao-he WWTP (I), Guizhou
Bao-an WWTP, Shenzhen
Long-gang WWTP, Shenzhen
Nan-shan WWTP, Shenzhen
Qin-zhen WWTP, Guizhou
Hua-xi WWTP, Guizhou
Mei-xian WWTP, Guangdong
Zhen-yuan BOT WWTP,Guizhou
PIPED WATER...
 



Bao-an WWTP, Shenzhen

Client: Bao-an district government (Shenzhen)
Construction period: 1999-2001


This project is located in a relatively wealthy area of southern China and was the first WWTP in its district.  The plant has an average flow rate of 16 MGD. Han's engineers in Shenzhen, in affiliation with Tianjin Municipal Design Institute, provided both preliminary and detailed designs for the plant, which utilizes Han's SBR process. The effluent is discharged into a tributary of the Shenzhen River, which then flows into the adjacent Hong Kong Water District.